Star Gulf STB-1 and BP WA Topsides

Client: Star Gulf

Project: BP WA topsides installation, Baku

Scope of work: 2 x 120te Winches and 2 x 180kW Diesel HPUs

Project details

ACE Winches designed and manufactured two 120te winches and two 180kW diesel HPUs to assist with the installation of BP's WA topsides, offshore Azerbaijan. The equipment was installed onboard Star Gulf's STB-1 transportation barge. The project was completed successfully in 2005.