Pull-In Winch Package for Stampede Development Project

Pull-In Winch Package for Stampede Development Project

ACE Winches was contracted to provide a Pull-In Winch Package, ACE Personnel and ACE Engineering for the Stampede Green Canyon Development Project situated in the Gulf of Mexico. 

The ACE Pull-In Winch Package was required to pull in two umbilical’s to the Stampede Tension Leg Platform (TLP).  

Pull-in towers designed and installed by Subsea 7 were utilised to secure the winch and route the winch wire down through the required I-tubes.
The Stampede Development Project is a large oil and gas field located in the Central US Gulf of Mexico in water depths ranging from 3,300 to 3,700 ft.  Stampede is a joint development previously known as Pony Knotty Head. It is Hess-operated with partners Chevron, Nexen and Statoil.